Al Baker Plays Down A380, Dreamliner Delays

Reuters09.03.2012 Aviation & Space
Al Baker Plays Down A380, Dreamliner Delays

Al Baker Plays Down A380, Dreamliner Delays

Facebook icon
Twitter icon
LinkedIn icon
Google icon
e-mail icon

The Head of Qatar Airways, usually one of the aircraft industry's fiercest critics, expressed confidence that Airbus and Boeing would resolve a series of high-profile glitches but warned against further production delays.


The endorsements from a top industry figure best known for lambasting manufacturers over delays will come as a relief to both plane makers as they count the cost of recent mishaps.

Chief Executive Akbar Al Baker said it was normal for new aircraft such as the Airbus A380 superjumbo and the Boeing 787 Dreamliner to have teething problems and stressed safety was not an issue.     

He also seemed satisfied with Boeing's production plans for its new 787 Dreamliner, although many analysts have described the company's plans to boost production to 10 aircraft a month by end-2013 from 2.5 now as optimistic.     

“The 787 will be a very good airplane. I am confident,” Al Baker told Reuters.

“I cannot discuss the details, but I can tell you that they have a very achievable ramp-up strategy,” he said after being briefed on the plans for record wide-body aircraft production.

Boeing is grappling with a problem of delamination or the separation of bonded layers in part of the composite structure of its lightweight Dreamliner, while Airbus is wrestling with a series of cracks on components inside the wings of its A380 superjumbo.        

“I think they will solve the problems with the A380. It is not a big issue...it is an aircraft that is in its infancy,” said Al Baker.

Source: Reuters

 



 
 

Latest events

Latest Issues

 

THE WORLD DEFENSE ALMANAC 2024