Navantia Closes Resistant Hull of S81 “Isaac Peral” Submarine

10.01.2020 North America
Navantia Closes Resistant Hull of S81 “Isaac Peral” Submarine

Navantia Closes Resistant Hull of S81 “Isaac Peral” Submarine

Facebook icon
Twitter icon
LinkedIn icon
Google icon
e-mail icon

Navantia finalized last month, in the Cartagena facilities (Spain), the closure of the resistant hull of the S-81 ‘Isaac Peral’ submarine for the Spanish Navy, after the union of the last section of the ship.

Held last month, the event has been attended by the General Director of Programs from the Ministry of Defense (MoD), General Salvador Álvarez Pascual; the Chief of the Cartagena Arsenal, Vice Admiral Aniceto Rosique Nieto; the Director of Engineering and Construction, Vice Admiral Manuel Martínez Ruiz; the Chief of the Logistics Division, Admiral Gonzalo Sanz Alisedo; the Head of the Naval Systems Department of the DGAM, Nicolás Lapique Martín, and the Head of the S-80 Program, Javier del Corral. On behalf of NAVANTIA, the Director of Operations and Business, Gonzalo Mateo Guerrero-Alcázar; the Director of the Shipyard and S-80 submarines Program, Agustín Álvarez Blanco; the Director of Navantia Sistemas, Vicente Santamaría Calvario, and the head of the S-80 Program Office, Ignacio Núñez.

The event began with a brief tour of the submarine, where the progress of the construction of both the S-81 and S-82 submarines was shown. Next, a brief presentation of the submarine’s construction process was made, after which the Director of the Shipyard of Cartagena and the General Director of Programs from the MoD have given a speech, highlighting the importance of this event and the S-80 submarines program.

The closure of the resistant hull is a crucial milestone in the construction of a submarine, as it appears as a complete vessel. Previously, the loading of all the main modules has been carried out, as well as a very high level of completion of the sections. The next step is the completion of the fitting works and the beginning of the testing stage.

This step represents a change of phase. The work in the submarine is now focused on its launching, following a formal and regulated process, based on overcoming safety milestones. This process begins with the tensioning, when the submarine begins to receive electric current; then the battery boarding, to gain autonomy in power generation, and finally the floating and the sea trials.

The scheduled date for floating is October 2020.

The S-80 is the most advanced conventional submarine in the world. Its main features are:

  • Length 80,81 m
  • Total Sleeve 11,68 m
  • Total Strut 13,69 m
  • Diameter 7,30 m
  • Surface displacement / immersion 2,695 / 2,965 t
  • Accommodation 32 provision + 8 special forces
  • Conventional submarine of high autonomy equipped with anaerobic propulsion
  • Extremely low acoustic signature
  • Excellent maneuverability at low speed
  • Systems with high automation
  • Next generation combat system
  • Air independent propulsion system (AIP) – State of the art
  • High complexity integrated design

 

 

 



 
 

Latest events

Latest Issues

 

THE WORLD DEFENSE ALMANAC 2024