Start of Final Assembly on 2nd Serial A400M
21.03.2012 Asia
The Airbus Military A400M final assembly line (FAL) in Seville (Spain) has begun working on the second serial production A400M.
The integration of the wings and central wing-box for this aircraft, known as MSN8, began in February.
The rest of the main components of the second A400M destined for delivery to a customer (the French Air Force) arrived in Seville over the last few weeks: the vertical tailplane (VTP) from Stade (Germany); the nose from Saint Nazaire (France), the horizontal tailplane (HTP) from the nearby Tablada site (Seville), and the fuselage from Bremen (Germany).
France will receive this second A400M military airlifter in 2013.
The integration of the wings and central wing-box for this aircraft, known as MSN8, began in February.
The rest of the main components of the second A400M destined for delivery to a customer (the French Air Force) arrived in Seville over the last few weeks: the vertical tailplane (VTP) from Stade (Germany); the nose from Saint Nazaire (France), the horizontal tailplane (HTP) from the nearby Tablada site (Seville), and the fuselage from Bremen (Germany).
France will receive this second A400M military airlifter in 2013.
Latest news
Latest events
4th Saudi International Maritime Forum
23 - 25 Nov 2026Sofitel Riyadh Hotel & Convention Center - Saudi ArabiaI/ITSEC 2026
30 Nov - 04 Dec 2026Orlando, Florida - United StatesGlobal Airport Forum (GAF 2026)
30 Nov - 01 Dec 2026Riyadh Front Exhibition & Conference Center - Saudi ArabiaIDEX-NAVDEX 2027
25 - 29 Jan 2027ADNEC Centre Abu Dhabi - United Arab Emirates







